EIP-7907 (Meter Contract Code Size) now Proposed for Hegotá
EIP-7907 proposes charging extra gas for loading contract code larger than 24 kilobytes, a change now proposed for Hegotá, the fork after Glamsterdam, to better price resource-heavy contracts.