The proposal would track two counters for each transaction, one following the legacy gas schedule and one for billing, so gas accounting can change without breaking old rules.
This validator client test version prepares node operators for the Gloas part of Glamsterdam on the Hoodi test network, and it should not be used on mainnet.
The draft would let a validator's consensus software warn its execution software which blocks it will propose soon, including fee recipient and gas limit, so block building can prepare earlier.
Proposing execution batches of N blocks per slot under ePBS allows throughput scaling while keeping per-block gas unchanged and maintaining validator builder separation.
Lodestar's stable release adds proposer preference tracking, builder payload envelope features, and schedules the Gloas fork with a 200M gas limit increase on Hoodi testnet.
More: Lodestar releases
The All Core Devs Execution (ACDE) call also scheduled Glamsterdam's Hoodi testnet fork, set a gas limit change to activate at that epoch, and advanced several Hegotá EIPs, including a paired post-quantum account migration path, to Considered for Inclusion status.
Ethereum's next mainnet fork activated on Sepolia on schedule, and infrastructure teams are now instrumenting the data volume the upgrade generates for production readiness.
More: Lodestar releases · Ethereum Foundation Blog · Teku releases · Reth releases · Prysm releases · Cointelegraph · Nimbus releases · SSV node releases · Unchained · Forkcast · The Defiant · Bankless · EthPandaOps · CoinDesk
The All Core Devs Testing (ACDT) call confirmed Ethereum's proposed 200M gas limit increase is safe for execution, picked 'confirmed' as the name for a new fast-confirmation block tag, and locked in client releases ahead of the Sepolia Shadow Fork test.
More: Ethereum Magicians
The All Core Devs Execution (ACDE) call approved a 200 million gas limit for Sepolia's Glamsterdam fork, confirmed the fork for October 6, and flagged a JUMPDEST-based attack that can slow block execution to 8 to 14 seconds.
The Rust client releases a versioned upgrade for the next mainnet fork, targeting Sepolia activation on October 6.
More: ethrex releases · ethrex releases
A simulation shows how Glamsterdam's gas repricing and tripled gas limit affect fee pressure and user behavior, revealing whether cheaper gas capacity eases or attracts demand.
Glamsterdam's early testing phase launches with gas limit changes that require wallet and indexer updates.
A new proposal adjusts the state-gas limit after EIP-8037 activates to ensure demand for state and execution capacity stays balanced across the network.
More: Ethereum Magicians
A proposal updates the gas cost per state byte to align with changes in Ethereum's block gas limit, refining state growth economics.